x

Foundation Slab Hydrodem

x
Name(Required)
PROJECT DESCRIPTION

A recent project was undertaken for a Southampton building contractor, who was extending a multistorey car park. They needed to install more foundation piles, however in three areas, they encountered the existing concrete foundation. The concrete was removed using high volume Hydrodem techniques over three shifts.

PROJECT OVERVIEW
SERVICE
Hydrodemolition

Operational Footage

Contact Us

We are always happy to make new connections,
so if you wish to work with us or simply want more information regarding Hydro Demolition, Surface Preparation and Tank Cleaning

Name(Required)