Salt Barn Hydrodem
x
PROJECT DESCRIPTION
The main structure of the Highways Saltbarn was in poor condition. This was due to the Chloride attack from the salts stored, which resulted in a deterioration of the concrete. Hydrodemolition techniques made light work, with 10m3 removed in just 6 shifts!
PROJECT OVERVIEW
SERVICE
Hydrodemolition
Operational Footage
Contact Us
We are always happy to make new connections,
so if you wish to work with us or simply want more information regarding Hydro Demolition, Surface Preparation and Tank Cleaning
