x

BAE Grout Pipeline

x
Name(Required)
PROJECT DESCRIPTION

Sabre Jetting were asked to remove site debris and grout build up from 40m deep pile tubes. A 40m long flexible lance was attached to a specially designed lance extension and ceramic cutting nozzle. Approx 40 of the tubes were cleaned successfully.

PROJECT OVERVIEW
SERVICE
Tank Cleaning

Operational Footage

Contact Us

We are always happy to make new connections,
so if you wish to work with us or simply want more information regarding Hydro Demolition, Surface Preparation and Tank Cleaning

Name(Required)